Laserfiche WebLink
r~, DS~~ <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />~~s, ~ ~ <br />STATE OF COLORADO <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 ~/ <br />Phone (303) 866-3581 Response to Reclamation Permit Application Consideration <br />FAX (303) 866-3589 <br />httpalwww.water. state.co.us <br />RECEIVED <br />DATE: July 9, 2007 ~~ Q 9 Z~n~ <br />TO: Thomas A. Schreiner, Environmental Arotection Specialist Dwlsloir c., rxectamation, <br />%~ Mining and Safety <br />CC: Division 6 Office; District 47 Water Commissioner <br />OF'c0`„ <br />R"' `spy <br />.t <br />.^,e'' "$ <br />~'~y <br />~ /ai6 ~ <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />(Vacant) <br />State Engineer <br />FROM: Cynthia J. Love, Water Resources Engineer ~~ / <br />RE: Operator: Glenn E. Sessions & Sons, Inc., Bond Pit, File No. M-2007-035 <br />Section 9, Twp 9 N, Rng 79 W, 6th P.M., Jackson County <br />Landowner- Glenn E. Sessions & Sons, Inc. <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclamation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well permit, as applicable. Prior to obtaining a permit, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locations of all wells within 600 feet mile of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or contact this office regarding the <br />600 foot spacing notification/hearing process. <br />^ The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will no[ alter or impact the historic operation of existing water rights. <br />^ The applicant has indicated plans to use other water for:_uses at the permit site, _storage in the excavated <br />area(s). The applicant will need to provide evidence to this office that the water is permitted or decreed for such <br />uses. <br />^ Other: <br />COMMENTS: <br />