My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO29529
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO29529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:28 PM
Creation date
11/20/2007 11:03:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Hydrology
Doc Date
5/24/1993
Doc Name
REQUEST FOR STORMWATER EXEMPTION
From
KERR COAL CO
To
WQCD
Permit Index Doc Type
NPDES Permit
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~' <br />Ms. Ann Ihl "feldt <br />Date -~ <br />Page wo <br />All sedimentation ponds aze designed to contain the full design runoff volume resulting from <br />a 10 year, 24 hour storm even[. Stormwater storage apaaty is in addition to design sediment <br />storage and any permanent storage capacity. Kerr inspects all sedimentation ponds on a <br />quarterly basis. Inspections include evaluation of acwmulated sediment levels relative to design <br />sediment storage rapaaty to verify that design Stormwater storage capacity is maintained at all <br />times. If inspections indicate that sediment accumulations are ar or near the design sediment <br />level, Kerr removes accumulated sediment from the pond(s) within a reasonable period (typically <br />30 to 60 days) following the inspection. Both pond inspection reports and documentation of <br />pond cleanout are retained at the minesite and are available for inspection by authorized agenry <br />representatives. Based on direct observation of pond storage levels at the time discharge <br />omtrred, the discharge resulted from: <br />~( Rainfall or snowmelt runoff volumes less than or equal to the design 10 year, 24 <br />hour storage volume <br />^ Rainfall or snowmelt runoff volumes greater than the design 10 year, 24 hour <br />storage volume <br />Based on the preceding information, Herr respectfully requesu that the Water Quality Conuol <br />Division approve a Stormwater exemption for eaceedance of effluent limitations consistent with <br />exemption and assodated burden of proof provisions as outlined in Permit COG850021. I[ is <br />understood that this exemption applies only to the speafied monitoring period(s), the subject <br />outfall(s), and the following effluent parameters: <br />~0 'rss 305 <br />^ Settleable Solids <br />~' Other T.P.aJ ! G 3D7`- <br />We appreaate your consideration of and cooperation is [his [natter. Please feel free to contact <br />me with any questions or if you require further documentation. <br />in ely, ~/~~~ <br />err Coal Comp y <br />o~_~anosTOx~++.e~.~ <br />x,o ~ ,gym <br />
The URL can be used to link to this page
Your browser does not support the video tag.