Laserfiche WebLink
Aggregate Industries - WCR lac <br />Ameadmeat No.l - Jeroaimus Property <br />Permit !i M-1999-034 <br />Karen Topper <br />8120 E. 104`" Avenue <br />Henderson, CO 80640 <br />(303) 838-5636 <br />October 22, 2003 <br />Division of Minerals and Geology <br />] 313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Attn. Larry D. Oehler <br />RE~cr~+t.-1+Io..P~-1999-034,-4~,~esdn~e~at-'lie: 1 <br />Aggregate Industries - WRC, Inc. <br />Deaz Mr. Oehler: <br />RECEIVE® <br />SEP 2 8 2004 <br />pirislon of Minerals and Geology <br />Thank you for forwazding to me a copy of the Division of Minerals and Geology letter of <br />September 25, 2003 to Mr. Mike Refer of Aggregate Industries. I have also received a copy of <br />Molen & Associates letter report dated September 18, 2003 discussing "sample results of D1MP <br />on Topper property and lake". I would like to comment on both of these documents and request <br />additional information. <br />On August 18, 2003, I submitted a letter to the Division requesting that Aggregate Industries <br />provide a sampling plan to assure consistency and quality of the data collected. In the Division's <br />letter of September 25, 2003 it was stated that Condition No. 1 of the MLRB Order states in part <br />"No de-watering or extraction activities will occur until Aggregate Industries develops a plan to <br />monitor the gravel pit pond water for diisopropylmethylphosphonate (DIl~) and obtains <br />approval of that plan from the Division of Minerals and Geology". That letter further indicates <br />that such a plan has not yet been submitted to the Division for approval. I would like to <br />emphasize that an appropriate monitoring plan should address the specific characteristics of the <br />chemical of concern. For example, what is the specific gravity of DIMP? Would you expect to <br />find it at the bottom of the water column or the top? What is the compound's potential for <br />volatilization? What personal protective equipment and precautions should sampling personnel <br />be using? A monitoring plan should address the monitoring parameters, frequency of <br />monitoring, the sampling points, the method of sampling, the protocols for sample collection and <br />handling, the analytical method, the quality control protocols, the reporting requirements, etc. <br />The protocols should be appropriate for the chemicals of concern. <br />VVe believe that the consultant report submitted contains errors and deficiencies. The last <br />paragraph of page 1 of Molen & Associates September 18, 2003 discusses the completion <br />specifications of the water well sampled on my property. The summation information on the <br />next page has a discrepancy in the well depth and a significant error in the well volume <br />calculation. The completion report for this well indicates that the well is 86 feet deep. Molen <br />measured a static water level of 34 feet deep, thus the water column is approximately 52 feet. <br />