Laserfiche WebLink
• <br />• <br />• <br />Rule 2: Pemiirs <br />Lorencito Coal Company -Monitoring Plan <br />The monitoring plan for the LCC is established to verify the projections of the Probable Hydrologic <br />Consequences. To verify these projections, this plan is established for the monitoring ofthe first five-year <br />period. The plan designates sites that may be potentially impacted during this time period, along with the <br />water quality constituents that potential ly may be impacted, also. The sites will be monitored during the <br />initial five-year monitoring term. Locations ofall wells, stations, springs and seeps, windmills and ponds <br />aze depicted on Map 2.04.7-1. <br />Surface Water <br />Surface water sites designated for monitoring during this first five-year period areas are designated <br />in Table 2.05.6-9. <br />TABLE 2.05.6-9 <br />LORENCITO CANYON MINE <br />SURFACE WATER MONITORING SITES <br />Site Reason for Monitoring Year of Potential <br />Adjacent <br />Disturbance <br />JC-1 Surface Mine 2001 <br />LC-1 Surface Mine/I.oadout 2001 <br />LC-2 Surface Mine 2001 <br />PC-1 Surface Mine 2001 <br />PRGTY-I Permit Area 2001 <br />PRGTY-2 Permit Area 2001 <br />These sites would require monitoring for parameters as determined from the initial baseline sampling. To <br />determine these parameters the standads were compared to the values reported during the baseline period <br />and those values which exceeded standards or were within 80 %ofthe lowest standazds value. The list <br />of parameters in Table 2.05.6-10 is deemed adequate to monitor the surface stations. <br />~~-o l <br />2.05-105 (revised 07/25/01) <br />