My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE69791
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE69791
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:18:55 PM
Creation date
11/20/2007 11:02:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004022
IBM Index Class Name
Permit File
Doc Date
6/14/2004
Doc Name
Adequacy Review Comments
From
DMG
To
Hilltop Aquatic Investments LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lined Pit Guide 8 September 2000 <br />CLAY BACKFILL PIT LINERS <br />Applicants seeking the lower bond amount available under the regulated construction option. for a <br />reclamation plan that includes a clay lined reservoir must provide a design for the liner. The intent of <br />the design can be effectively conveyed through plan and section views of the pit perimeters where a <br />liner will be installed. The liner cross section should illustrate the dimensions and shape of the liner fill <br />to be installed, the location, size, and shape of the keyway, and the dimensions of liner cover fill that <br />will protect the liner soil from desiccation and erosion. The design should address the following <br />elements char may affect the performance of the liner. <br />Liner Fill Mixture <br />• Fines -The liner fill should contain at least 20 percent fines defined as the percentage, on a dry <br />weight basis, of material passing the No. 200 sieve. <br />• Plasticity Index -The soil should have a plasticity index of at least 10 percent, although some soils <br />with a slightly lower index may be suitable. Soils with plasticity indices less than about 10 percent <br />have very little clay and usually will not produce the necessary low permeability. Soils with <br />plasticity indices greater than 30 to 40 percent are difficult to work with, as they form hard chunks <br />when dry and sticky clods when wet. <br />• Percentage of Gravel -The percentage of gravel (material retained on the No. 4 sieve) should in <br />general not exceed 10 percent. Larger percentages aze acceptable if it can be demonstrated that the <br />design standazd for permeability can be achieved and that segregation of gravel into pockets that <br />contain little or no fines will not occur during installation. <br />• Stones and Rocks - No rocks larger than 2 inches should be present in the liner material. <br />If two or more materials will be blended to prepaze the liner fill, a description of the mixing process <br />should be included in the design documents. For example, an Operator may choose to prepaze the liner <br />fill by mixing 50 percent weathered shale ripped from the floor of the pit with 50 percent overburden. <br />The mixing may be accomplished by a number of methods such as windrowing of the materials and <br />multiple passes of mixing equipment such as a road reclaimer. <br />Water Content <br />The molding water content at which the maximum dry unit weight is observed for a given compactive <br />energy is termed the optimum water content. Soils compacted wet of the optimum water content tend <br />to have lower permeability. This is because a soil that is slightly wet of optimum will more readily <br />mold into a homogeneous mass [hat is free of clods. For liner fill, moisture content slightly wet of <br />optimum should be specified. For example: <br />Material represented by the samples tested having a water more than 1 percent dry of the <br />optimum water content, or more than 3 percent wet of the optimum water content will be <br />rejected and shall be removed or reworked until the water content is between these limits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.