My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE69720
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE69720
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:18:48 PM
Creation date
11/20/2007 11:00:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
ENVIRONMENTAL RESOURCES - AIR QUALITY APPENDIX
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'~ , <br />E <br />GENERAL TERMS AND CONDITIONS: IIMPORTANTI READ ITEMS 5.6.7 AND el <br />1. This permit is issued in reliance upon the accuracy and completeness of information suppliedby the applicant and <br />is conditioned upon conduit of the activity, or construction, installation and operation of the source, in accordance <br />with this information and with representations made by the applicant or applicant's agents. It is valid only for the <br />equipment and operations or activity specifically identified on the permit. <br />2. Unless specifically stated otherwise, the general and specific conditions contained in this permithave been determined <br />by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.517)(al, C.R.S. <br />3. Each and every condition of this permit is a material part hereof and is not sever~le. Any challenge to or appeal of, <br />a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall be <br />deemed denied ab inifio. This permit may be revoked at any time prior to final approval by the Air Pollution Control <br />Division IAPCDI on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air Quality Contrb <br />Commission IAQCC), including faire to meet any express term or condition of the permit. If the Division denies a <br />permit, conditions imposed upon a permit are contested by the applicant, or the Division revokes a permit, the <br />applicant or owner or operator of a source may request a hearing before the AQCC for review of the Division's action <br />4. This permit and any required attachments must 6e retained and made available for inspection upon request at the <br />location set forth herein. With respect to a portable source which is moved to a new location, a copy of the <br />Relocation Notice (required by law to be submittei to the APCD whenever a Dortable source is relocated) should be <br />attached to this permit. The permit may be reissied to a new owner by the APCD as provided in AQCC Regulation <br />No. 3, Part B, Section III. B. upon a request for transfer of ownership end the submittal of a revised APEN and the <br />required fee. <br />5. Issuance (initial approval) of an emission permit does not provide "final" authority for this aaivity or operation of this <br />source. Final approval of the permit must be secured from the APCD in writingin accordance with the provisions <br />of 25-7.114.5112)lal C.R.S. and AQCC Regulation No. 3, Part B, Section IV.H. Final approval cannot be granted <br />until the operation or activity commences and has been verified by the APCD as conforming in all respects with the <br />conditions of the permit. If the APCD so determines, it will provide written documentation of such final approval, <br />which does constitute "final" authority to operate. Comp/lance with the permit conditions must be demonsVared • <br />within 180 days after commencement o/opera Non. <br />6. THIS PERMIT AUTOMATICALLY EXPIRES tF you 111 do not commence construction or operation within 18 months <br />after either the date of issuance of this permit or the date on which such construction or activity was scheduled to <br />commence as set forth in the permit, whichever is later; 121 discontinue construction for a period of 18 months or <br />more; or 13) do not complete construction within a reasonable time of the estimated completion date. Extensions <br />of the expiration date may be granted by the APCD upon a showing of good cause by the permittee prior to the <br />expiration date. <br />7. YOU MUST notify the APCD et least thirty days (fifteen days for portable sources) prior to commencement of the <br />permitted operation or activity. Failure to do so is a violation of Section 25-7.114.5112)la), C.R.S. and AQCC <br />Regulation No. 3, Part B, Section IV.H.1 ., and can result in the revocation of the permit. You must demonstrate <br />compliance with the permit conditions within 180 de ys after commencement of operation as stated in condition 5. <br />8. Section 25-7-114.71211a1, C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) <br />must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be <br />discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification <br />annual fee billing will terminate. <br />9. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Pevention and Control Act or the <br />regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 25-7-115 <br />(enforcement), -121 )injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.R.S. <br />/ , <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.