Laserfiche WebLink
r <br />n <br />u <br />STATE OF COLORADO <br />COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT of cotc <br />AIR POLLUTION CONTROL DIVISION ~~ <br />~$ <br />TELEPHONE: (303) 692-3150 •~ <br />~ (876 ~ <br />CONSTRUCTION PERMIT <br />PERMIT No: 11 DL252-6 <br />DATE ISSUED: ADGOST 18, 1999 <br />ISSUED TO: BOWIE RESOURCES LIMITED <br />INITIAL APPROVAL <br />Modification 4 <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Coal mine known as Bowie Jl1 located at 1720 4010 Drive, Paonia, Delta County, <br />Colorado. <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: <br />Truck dump station controlled by a Mikropul Mod. No. 336 KTR-10 baghouse. <br />• THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR <br />QUALITY CONTROL COMMISSION AND THE COLORADO AIR QUALITY CONTROL ACT C.R.S. 125-7-1011 <br />et sea-, TO THOSE GENERAL TERMS AND CONDITIONS SET FORTH ON THE REVERSE SIDE OF THIS <br />DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />Visible emissions shall not exceed twenty percent (20°,G) opacity during normal operation of the <br />source. During periods of startup, process modification, or adjustment of control equipment visible <br />emissions shall not exceed 30% opacity for more than six minutes in any sixty consecutive <br />minutes. Opacity shall be measured by EPA Method 9. (Reference: Regulation 1, Section II.A.1.& <br />4.) <br />2. The permit number shall be marked on the subject equipment for ease of identification. (Reference: <br />Reg. 3, Part B, IV.E.) (State only enforceable) <br />This source shall be limited to a maximum processing rate as listed below and all other activities, <br />operational rates and numbers of equipment as stated in the application. Monthly records of the <br />actual processing rate shall be maintained by the applicant and made available to the Division for <br />inspection upon request. (Reference: Regulation 3, Part B,III.A.4) <br />Processing of coal shall not exceed 30,000 tons per day, 416,667 tons per month or 5,000,000 <br />tons per year. <br />During the first twelve (12) months of operation, compliance with the daily, monthly, and yearly <br />processing limitations shall be required. After the first twelve (12) months of operation, compliance <br />with only the daily and yearly limitations shall be required. Compliance with the yearly processing <br />• limits shall be determined on a rolling twelve (12) month total. <br />29/8/5 <br />7-2-3 a <br />~/$/Ob <br />