Laserfiche WebLink
Date <br />User <br />ITIFICATION <br />25-Oct-2004 <br />RCO <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Permit or job no.: M-2004-053 Site : Rivera'S Excavation Gravel Pit <br />Abbreviation : none State :Colorado <br />Filename : M053-000 County :Costilla <br />Agency or organization name : DMG <br />Permit or job action :New 110 app <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Pull topsoil down onto 2:1 slopes loader 1 19.5 $1,187 <br />002 -Spread topsoit/overburden on pit floor dozer 1 13.5 $1,634 <br />003 -Rip compacted areas ripper 1 1.7 $223 <br />004 -Revegetate site (2 acre disturbance) revege 1 10.0 $830 <br />005 -Haul reclamation equipment to and from site mobilize 1 4.2 $1,336 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 49.0 $5,210 <br />inclutles inflation factor adjustment of : NA <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- I_iabflily lnSUranCe <br />Performance bond <br />Job superintendent <br />Profit <br />1.55 <br />1.05 <br />NA' <br />10.00 <br />TOTAL DIRECT COST • ~ $5,210 <br />of direct <br />of direct <br />NA NA <br />of direct <br />total = $81 <br />total = $55 <br />total = NA <br />total = $521 <br />not required (or eqp. operator serves as super) TOTAL O & P = $656 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (tlirea+O&P)= $5,866 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $293 <br />CONTINGENCY - NA' NA total = NA <br />'contingencies accounted ror of task level TOTAL INDIRECT COST = $950 <br /> TOTAL BOND AMOUNT (direct + indirect) _ $6,160 <br /> <br />