My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO29487
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO29487
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:48:25 PM
Creation date
11/20/2007 11:00:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Hydrology
Doc Date
9/12/1985
Doc Name
C-047-81 QUARTERLY HYDROLOGIC BENCH MONITORING DATA
From
BLUE RIBBON COAL CO
To
MLRD
Permit Index Doc Type
OTHER GROUND WATER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />blue <br />ribbon <br />'~ Coal <br />company <br />RE~~1V~E~ <br />SEP '121985 <br />MiN~o i,ANa <br />RECLAMATiQP1 OiViSiON <br />Susan Mowry <br />Reclamation Specialist <br />Colorado ~vIined Land Reclamation <br />1313 Sherman Street, Room 423 <br />Denver, CO 80203-2273 <br />iiiiiiiiiiiiiiiiiii ~~ <br />999 <br />blue ribbon coal company <br />p. o. box 58 <br />delta, Colorado 81416 <br />1303) 8747561 <br />September 9, 1985 <br />Re: File # C-047-81, Quarterly hydrologic bench monitoring data <br />Dear Susan: <br />In accordance with our phone discussion July 1, 1985, enclosed is data for <br />the last quarter on the underdrains and piezometers installed in the mine bench. <br />The North subdrain has been monitored since April, see page GD-1 of the data <br />sheets submitted with the 1983 Annual Hydrologic Report. The Middle and South <br />subdrains were not adequately exposed for monitoring until July 3, 1985. At this <br />time the three drains are capable of individually draining into the #1 Pond, therefore <br />individual sampling was done this quarter. When the dirt stockpiled at the toe of <br />the bench is moved the three_drains will be connected by 1 ditch that dumps into <br />the pond and 1 collective sample will be taken. <br />The results are as follows: <br />North subdrain <br />Date 7-2-85 8-1-BS 8-29-85 <br />Flow(gpm) < 0.25 trickle trickle <br />pH 7.6 8.1 8.0 <br />Conductivity 1430@11°C 1710@15°C 1740@15°C <br />Lab. # 2059 <br />Middle subdrain <br />Date 7-2-85 8-1-85 8-29-85 <br />Flow none none none <br />South subdrain <br />Date 7-2-85 8-1-85 8-29-85 <br />Flow(gpm) < 0.25 trickle trickle <br />pH 7.7 8.3 8.1 <br />Conductivity 3420@11oC 0 <br />2500@18 C 3900@20°C <br />Lab. # 2060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.