Laserfiche WebLink
ENGINEER'S CERTIFICATE <br />OF <br />CONSTRUCTION <br />In accordance with Rule 4, Part 4.03.1(I)(d) of the Rules and Regulations of <br />the Colorado Mined Land Reclamation Board pursuant to the Colorado <br />Surface Coal Mining Reclamation Act 34-33-101 et seq., I, Curtis M. <br />Belden, hereby certify that, to the extent possible, Seneca II Mine Haul <br />Road A I was constructed according to the approved design as revised 4-19- <br />82. Minor field adjustments in horizontal and vertical alignment were <br />necessary during construction to compensate for unanticipated natural <br />conditions, achieve the flattest practical grade, limit the disturbed area, <br />and construct an alignment consistent with the existing and reclaimed <br />topography. To the best of my knowledge and belief, field adjustments <br />made during construction did not exceed the limitations of grade or slope <br />prescribed under the Rules and Regulations. <br />Curtis M. Belden <br />Colorado P.E. 17274 <br />-, -~ ., -~ <br />Date <br />