My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE69652
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE69652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:18:43 PM
Creation date
11/20/2007 10:59:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986160
IBM Index Class Name
Permit File
Doc Date
12/22/1986
Doc Name
FN M-86-160 ADEQUACY LETTER
From
MLRD
To
PARKERSON CONSTRUCTION INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />K <br />-2- <br /> <br />Describe how petroleum contaminated water used in the a phalt mix <br />plant will be stored and disposed of. <br />8: Explain how the Durant Pit and the Sunny Side Gravel Pi permitted <br />as separ to operations, will remain separate during mining and re lamation. <br />Describe how dust will be controlled. <br />1~If the entrance road off Durant Gulch Road is construct d to provide <br />access o the Sunny Side Gravel Pit, this road must be included i the permit <br />bound How will this affect the total acreage of the affected rea? <br />It is the staff's understanding th a site w• d at 3H:14 <br />slo Is this correct? Please explain N 0 - ~QC (~~~ ~ ~ ;~~ <br />Exhibit D - Reclamation Plan <br />The illustration entitled "Typical Finished Slope" on th submitted <br />map does not represent a 3H:1V slope. It is the staff's understaniing that <br />finish slopes will not be steeper than 3H:1V. Is this correct? <br />How will the operator reclaim the containment berm? <br />The staff recommends fertilizing the site prior to seedi g with 40 <br />lbs. available nitrogen and 40 lbs. available phosphorous. Please include <br />this re mmendation in the proposed reclamation plan. <br />Since the site is presently timbered, why are trees and hrubs not <br />included in the reclamation plan? <br />Exhibit E - Maps <br />1. Include the following <br />The entrance road <br />boundary, if applicable. <br />items on Exhibit E - Map: <br />off Durant Gulch Road within the p@rmit <br />if. The runoff containment berm. <br />The plant growth material stockpile and processing ai <br />lower bench. <br />locatable points for on-site orientation. <br />Exhibit F - Le al Ri ht to Enter <br />. Provide the land description for property referred to in <br />Warranty Deed. <br />•eas on the <br />,the <br />
The URL can be used to link to this page
Your browser does not support the video tag.