Laserfiche WebLink
<br />EXHIBIT B <br />ALL THREE SITES ARE FLAT AND WILL BE UTILIZED AS EITHER <br />OR BOTH A CRUSHER OR SCREENING PLANT INSTALLATION. THE ANSLEY <br />FLAT SITE WILL BE EXCAVATED FROM THE NORTH PSID-POINT OF THE <br />LOT BACK TO THE WEST AS SHOWN ON ATTACHMENT. WATER COULD <br />POSSIBLY SEEP INTO THE EXCAVATION IF TAKEN DOWN DEEP ENOUGH. <br />PRESENT EXCAVATION IS APPROXIMATELY 4' AND IS DRY. DUST <br />ABATEMENT ON THIS SITE IS CONTROLLED BY HAULING WATER TO THE <br />CRUSHER. <br />THE JEFFERSON FLAT SITE WILL BE EXCAVATED FROM THE <br />EXTREME NW CORNER TO THE SOUTH AND EAST. EXCAVATION HAS NOT <br />BEGUN ON THIS SITE. WATER FOR DUST ABATEMENT WILL BE PUMPED <br />FROM JEFFERSON CREEK ON SITE. <br />THE II MILE SITE WILL BE EXCAVATED FROM THE SE CORNER <br />UP TOWARDS T:1E NW CORNER. DUST ABATEMENT ON THIS SITE IS <br />CONTROLLED BY HAULING WATER TO THE CRUSHER. <br />DEPTH OF EXCAVATION ON ALL SITES WILL DEPEND ON EXTENT <br />OF CRUSHER MATERIAL. <br />_ ,_ ~ ..~ <br />. ' ~ '';~0 <br />~... <br />