<br /> <br />RE: June 5 Letter from Bradford Jones, File /IM-77-519 <br />Item ll3 <br />It is anticipated that topsoil will be reapplied to affected lands to <br />be revegetated at a depth of at least 6 inches. Existing topsoil stockpiles <br />were reviewed in the field and appear to be sufficient in quantity to pro- <br />vide for at least the six-inch depth stated above. As Phase i progresses <br />there will be little if any additional topsoil to be removed in the mining <br />process. Any such material encountered will be stored in one of the exist- <br />ing topsoil stockpiles for use in the reclamation process. <br />Inadvertently, a part of the soils report from the Soil Conservation <br />Service was omitted from the initial application. I[ is enclosed with this <br />submission and should be included as part of Exhibit I. <br />Item X16 <br />Final delineation and detail of the pond shoreline will be determined <br />as a part of development plan for the post-mining recreation land use. As <br />this final land use will be reviewed upon completion of mining by the Routt <br />County Planning Commission further input from the Division of Wildlife can <br />be obtained at that time to enhance the wildlife and aquatic habitat. <br />Item !IS -- Revised Reclamation Costs <br />Major Disturbance (one acre maximum) includes slope reduction on pond <br />banks and limited active mine area: <br />Backfilling 2500 cu yds @ $ .70/yd $ 1,750.00 <br />Grading 1614 cu yds @ $ .80/yd 1,291.20 <br />Topsoiling 405 cu yds @ $ .65/yd 263.25 <br />$ 3,304.45 <br />~ Moderate Disturbance includes 3.0 acres of parking/plant facilities and <br />/ access road which will remain after mining operations and not be Further <br />/~, 09. reclaimed There is an additional 4.5 acres of moderate disturbance which <br />lµ will be reclaimed as mining progresses: <br />Rippingjscarifying 3.5 acres @ 1/ac/hr @ $50 $ 175.00 <br />Grading 1614 yds> 1 ac, $ .80/yd 1,291.20 <br />Topsoiling 807 yds/ac, 4.5 ac @ $ .65/yd 2,360.50 <br />Seed @ $125/ac ) <br />Fertilizer @ $50/ac) $300/acre 1,350.00 <br />Mulch @ $125/ac ) $ 5,176.70 <br />