My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE69581
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE69581
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:15:02 PM
Creation date
11/20/2007 10:57:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200522306
IBM Index Class Name
Permit File
Doc Date
3/29/2007
Doc Name
Exploration Project Update /180 Day
From
Oxbow Mining, LLC
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/~ <br />~1 <br />XBOW M1NING, LLC ^ <br />3737 Hwy 133 P.O. Box 535 Somerset, Colorado 81434 ~el (970)929-5122 Fax <br />(970)929-5177 `., ~ ~ ~ /~ r~ <br />March 23, 2007 <br />MARL 9 2UU7 <br />Mr. Dan Hernandez ~1Vjs~on of Rana;nauoq <br />Senior Environmental Protection Specialist M'~~~9 and Safety <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Re: NOI X-2005-223-06. Exploration Project Update, Oxbow Minim, LLC. <br />Dear Mr. Hernandez, <br />The purpose of this letter is to provide an update to the subject 2005 NOL Due to poor <br />availability of drill rigs in 2005, drilling activities were not initiated unti12006. 2006 was a <br />successful drilling year. <br />Approved Proeram Update <br />1. ECM-OS-27 -Drilled in 2006 and plugged, graded and seeded. A borehole completion <br />report is attached. <br />2. ECM-OS-28 -Drilled in 2006 and plugged, graded and seeded. A borehole completion <br />report is attached. <br />3. ECM-OS-39 -Drilled in 2006 and plugged, graded and seeded. A borehole completion <br />report is attached. While an angle hole was also planned at this location to further define <br />the presence of burn, no such hole was drilled. <br />4. ECM-OS-43 -Drilled in 2006 and plugged, graded and seeded. A borehole completion <br />report is attached. All temporary light use roads were also reclaimed and seeded. <br />5. ECM-OS-44 -Drilled in 2006 and plugged, graded and seeded. A borehole completion <br />report is attached. All temporary light use roads were also reclaimed and seeded. While <br />an angle hole was also planned to further define the presence of burn, no such hole was <br />drilled. <br />6, 7. ECM-OS-45 and 45A -Drilled in 2006 and plugged, graded and seeded. Borehole <br />completion reports are attached. All temporary light use roads were also reclaimed and <br />seeded. The second borehole was an angle hole drilled to further define the presence of <br />burn. <br />As all of the boreholes were located on lands managed by the BLM, the required BLM seedmix <br />was used in the fall of 2006. <br />• Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.