t '
<br />1
<br />1
<br />t
<br />1
<br />1
<br />1
<br />1
<br />it MINE PUMPIN6
<br />DATE METER 1 METER 2 GALLONS DAYS GPM
<br />9/30/85 9,287,800 5,965,800
<br />11/4/85 15,444,300 7,869,900 9,060,600 35 180
<br />12/2/85 22,041,100 9,387,900 7,114,800 28 116
<br />1/3/86 28,526,600 10,873,600 7,971,200 32 173
<br />2/3/86 34,982,800 12,100,400 7,683,000 31 172
<br />3/3/86 40,457,100 13,441,400 6,815,300 28 169
<br />3/31/86 45,286,300 14,884,000 6,271,800 28 156
<br />4/28/86 48,264,900 15,036,300 3,130,900 28 78
<br />6!3/86 54,654,200 15,727,800 7,080,800 36 137
<br />Total 55,128,400
<br />~3 MINE PUMPIN6
<br />9/30/85 34,691,200
<br />11/4/85 38,047,100 3,355,900 35 66.6
<br />12/2185 40,701,200 2,654,100 28 65.8
<br />1/3/86 43,712,900 3,011,700 32 65.4
<br />4/7/86 48,122>900 4,410,000 94 32.6
<br />9/4/86 -0- 30
<br />9/16/86 0 (meter not operative) 554,400 (talc) 25
<br />9/30/86 432,500 432,500 25
<br />Total 14,418,600
<br />
|