My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-11-16_PERMIT FILE - C1981012A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2006-11-16_PERMIT FILE - C1981012A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 10:05:15 AM
Creation date
11/20/2007 10:56:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
11/16/2006
Doc Name
Partial Phase I Bond Release
Section_Exhibit Name
Exhibit 28 Appendix A Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION ~~ ~ ~ ~ sheet 2 of 2~~~ <br />• Hauling Capacity <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume : 14.00 LCY <br />Rated payload : 48,000 pounds <br />Payload capacity : 18.82 LCY <br />Material description <br />Earth -Dry packed <br />Heaped volume <br />Average volume <br />Adjusted capacity <br />Cvcle Time <br />Scraper loading time `: 0.40 minutes <br />Maneuver and spread time : 0.60 minutes <br />'load time per scaper pair on push-pull models <br /> <br />20.00 LCY <br />17.00 LCY <br />17.00 LCY "* <br />hourly production reflects volume per scraper pair on push-pull models <br />I r_r. n__.r.:..., r...._...:....... cae ~w.~ sae ra t ~ ~ ann <br /> Scraper Push dozer Source <br />Altitude adj.: 1.000 1.000 (Cat HB) <br />Job efficiency : 0.830 0.830 (Cat HB) <br />Net correction : 0.830 0.830 <br />Travel time <br />Road condition description :Firm, smooth, rolling, dirt/It. surfaced, watered, maintained <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 5,000 -6.00 3.00 -3.00 2938 1.75 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Haul time : 1.75 minutes <br />Return route <br />minutes <br />[able velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) <br />Unadjusted unit production/hour : 187.89 LCY/hour "' Adjusted for job conditions <br />Optimal number of scrapers per push dozer : 7 Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br />JOB TIME AND COST <br />• Fleet size : 1 Team(s) Total lob time <br />Unit cost $1.753 /LCY Total lob cost <br />~X z~ % -3 9 0 ~ ~ ~ <br />5.43 minutes <br />155.95 LCY/hour <br />2 scraper(s) <br />311.90 LCY/hour <br />311.90 LCY/hour <br />......................................................... <br />11.00 Hours <br />$6,013 <br />~iw~~a6 SLOZ <br />"travel time tar each segment is adjusted for aa:eieration/deceleration. Return time : 2.67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.