Laserfiche WebLink
<br />RECLAMATION COST SUMMARY coot d <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description <br />________I__________________________________ <br />___________________________________________ <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.~ iask Description <br />________I__________________________________ <br />___________________________________________ <br />M. MISCELLANEOUS RECIAMATION TASKS <br />Task No.~ Task Description <br />_ ~ Demolition <br />3 ~ Seeding <br />~ Fencing <br />4 ~ Mob/Demob <br />sheet 4 0£ 4 <br />~ Cost (51 <br />_______________I____________ <br />____________________________ <br />Subtotal (K1: <br />~ Cost (5) <br />Subtotal IL): <br />~ Cost ISI <br />_______________I____________ <br />528,185 <br />52.619 <br />____________________________ <br />Subtotal (M): 530,804 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A Lhrough M1: 50,023 <br />II. INDIRECT COSTS <br />» <br />.a~.. <br />.......~........~a»...........~»veep...... <br />A. CONTRACTOR'S OVERHEAD fi PROFIT ..~~~. <br />......... . <br />..... <br />Ii em No.~ ltem Desczipt loo <br />________ <br />___________________________________ ~ <br />________________ Cost l5) <br />___________ <br />I <br />1. ~ Public Liability Insurance.... 1.5501 of dit. ~ $1, OBE <br />2. ~ Contractor's Performance Bond 1.5501 of dir. ~ 51,085 <br />3. ~ toot ractor's Profit........... 10.001 of dir. ~ 57,002 <br />4. ~ Job Superintendent.. <br />____________________________________________ ~ <br />_________________ <br />___________ <br /> Subtotal IA1: 59.1"17 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT' (di recc plus 0 fi P1: 5"/9,196 <br />B. DMG PROJECT ADMINISTRATION E%PENSES <br />Item NO.~ Item De9crlptlOR COeC I$) <br />1. ~ Minerals Program Admin. Fee at B.OOt of cn[r.~ 53,960 <br />NET INDIRECT COST PERCENTAGE: 1B .'16t Subtotal (B1: 53,960 <br />TOTAL. INDIRECT RECLAMATION COSTS (subtotals A through e): 511,133• <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect coscsl : ' $83.1$$ <br />