Laserfiche WebLink
<br /> <br />ROMABLE EQUIPMENT: sheet 2 cf 2 <br />--"--"--"'--"- iota) Eqp. Flee[ Size Haul Trip Rec urn Trip <br />Machine Description Cosc/hr lno. hauled) Cosc/hr [ost/hr <br />= Subtotals 50.00 50.00 <br />MOB/DEMOB SUPPORT EQUIPMENT: '----'~-- '--'~-'-- <br />'--"--"--"'"--"-----"- Weight Ovne rs hip Haul Rig Fleet Size Haul Trip Return Trip DOT Perm It <br />Non-ROadable Eqp. Description (cons) Cost/hr Cost/hr Ino. hauled) Cosc/hr Cosc/hr Cost/ea <br />.............~..~......~a~..~z=.......»..»....~...~~.. ....~~~..~~....»_... <br />Sub tots is »...~~...._~ <br />50'.00 <br />______-__ ..~_...»...»....~...e~.. <br />50.00 $0.00 <br />_________ _________ <br />Toca1 Eqp. Fleet Sire Haul Trip ReCUrn Tripe <br />Roadahle Eqp. Description Cost/hr <br />..,...,~.........~....~.~~....~...~...~~..~..~....,,.... (no. hauled) <br />~~..~.~...._~~...»~.. Cosc/hr <br />.~.....~.... Cos[/hr <br />~...~a....~.. <br />Subtotals <br />EQUIPMENT HAUL DISTANCE 6 TIME <br />Nearest major city or coon wi thin proj eeC area region: Eagle <br />Total one way travel distance - 15 .0 miles. Average travel speed . <br />Job Time - Non Roadahle Equip.• 0. 50 hours load Roadahle Equrp.= <br /> 0. 50 hours haul <br /> 0. 50 hours unlcad <br /> 0. 50 hours return <br />JOB CGST <br />Total McE/Demcb Cost - $2,619.40 <br />$0.00 50.00 <br />70.00 mph. <br />N/A hours load <br />0.50 hours haul <br />N/A hours unload <br />0.50 hours return <br />NDT'c: Non-roadabie equipment (haul rig regv iced [c transport) mob/demob costs based on 2 round trips, each crap <br />consisting of a one-way loaded haul and a one-way empty roc urn. Roadahle equ rpment fno haul rig requ iredl <br />costs based on one round trip. Colorado DOT requires spec iai permits Eor oversize equipment on certain <br />specified road segments within [he S[ace. Separate permits are required for each rig on each loaded cri p. <br />Additions lly, pilot cars lone or two per rig depending on degree of oversize) are also required Eor oversize <br />equipment hauling, antl loa drug/unloading times must be ant teased su bs[ancially Cor equipme nc which must be <br />pa rcially dismantled for transport and re-assembled ac [he job site. Cos cs for lifting equipment and ocher <br />support equ ipmenc neetled for this work should be included rn the mob/demob costs. <br />