Laserfiche WebLink
<br />E~~A <br />s Coa~Company Seneca Coal Company <br />RECEIVED <br />APR 1 1 1997 <br />Division of Mmerais a uawoy} <br />April 7, 1997 <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Quarterly Sedimentation Pond Inspections - Seneca II Mine <br />Dear Ms. Crosby: <br />Enclosed is the first quarter inspection reports for Ponds 002, <br />003, 004, 008, the PeCoCo Reservoir, Spill Control Pond #2 and <br />both truck wash ponds at the Seneca II Mine. All conditions <br />appeared stable and acceptable. <br />If you have any questions <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Gary Wendt (PWCC) <br />please call me. <br />Sincer <br />c <br />Mich sbf <br />Engi e~ <br />G.Z~Sltdv l~a, P.E. <br />ing Man <br />-`~ APR 0 7 1997 <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />