Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />Identification <br />During Inspection: <br />mate Water Level <br />nt (% total storage) <br />(cfs) <br />Lodestar Ener ,Inc. Quarter: <br />McClave Can on Mine C-80-004 Inspection <br />Sediment SAE 1 SAE 2 SAE 3 <br />Pond Office To soil Soil <br />Pool D D D <br />0% 0% 0% 0% <br />0 0 0 0 <br />l_ nuuiem I~ nuuieni ~ =- <br />Rills & Gulleys No <br />Inadequate Vegetation No <br />Outlet Channel Erosion No <br />Burrows No <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />purtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />No <br />No I No <br />Comments Water in sediment pond is 2 feet below primary spillway. <br />Office silt fence is in good shape. <br />Required: A trench constructed behind the soil stockpile silt fence needs to be deeper. <br />The silt fence could be shortened to 16-feet. o ~ ~ e sp,g~ <br />~®Ap0 <br />d0~~ `~7 ~ T °', ~ ~i <br />s <br />oflnspector: Jim Stover <br />P. E. 19230 <br />V Aoh <br />