My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE69486
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE69486
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:14:57 PM
Creation date
11/20/2007 10:54:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979070
IBM Index Class Name
Permit File
Doc Date
4/21/1979
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ • • <br />FYHTRTT .1 <br />Vegetation Information <br />The present vegetation consists primarily of sparse pasture grass less than <br />a foot tall. Cottonwood trees ranging up to 40 feet or more in height exist <br />along the Big Thompson River primarily in the northwestern corner of the area. <br />Most of the existing trees will be preserved for their aesthetic value. <br />EXHIBIT K <br />Climate <br />The average annual rainfall is 14 in. +, the prevailing winds are from the <br />north-northwest reaching a maximum velocity of approximately 100 mph. The <br />temperature on the average ranges from - 10°F to + 100°F. <br />EXHIBIT L <br />Reclamation Costs <br />The total costs of reclamation are estimated at $31,820.00, which includes <br />backfill, topsoil replacement. and riprap for all fill areas as indicated on <br />' the reclamation plan map. Also included is,the reseeding of, all lake slopes, <br />r. overburden storage.areas, fill areas and the_crusher.'and equipment area. The <br />' reseeding Costs were estimated at $85.00 using an application rate of <br />12 lb./acre and $1.15/lb. The total cost of the earthwork is estimated to be <br />$23,885.00 using $0.35 per cubic yard and the riprap cost is estimated to <br />' be $7,850.00 based upon $5.00 per cubic yard. An additional cost of recla- <br />mation is the replacement of water lost to evaporation. Based upon 0.1 in./day <br />for eight months, the expected evaporation is 21.3 ac-ft which will be offset <br />ac-ft yr <br />by augmentation of a portion of the 318.5 yr from Sump No. _1 as described <br />in Case No. W-4099 of the Water Court, Division 1, State of Colorado, dated <br />March 14, 1974. <br />
The URL can be used to link to this page
Your browser does not support the video tag.