Laserfiche WebLink
,.._, <br />,:, .. <br />~ ~~~~}~~.iOp.. <br />~'L~:i •• <br />,~'?~•TERROR CREEK COMPANY <br />' . ~ ,; ;;.. Permlt No. 82DL343-1 F <br />::Initial Approval -Modification-2 <br />`~ Pape 3 <br />;'`}~h};~,. PARTICULATE EMISSIONS CONTROL PLAN <br />,. ~,. <br />'''~'~~i~i, = <br />'':~,THE`~ FOLLOWING PARTICULATE EMISSIONS CONTROL MEASURES SHALL BE USED =.FOR`'• <br />" ENFORCEMENT PURPOSES ON THE SOURCES COVERED BY THIS PERMIT, AS REQUIRED BY THE <br />AIR QUALITY CONTROL COMMISSION REGULATION N0.1. THIS SOURCE IS SUBJECT TO 'fHE <br />FOLLOIA~Ir;~; EMISSION GUIDELINES: ~ . <br />~r= a ~ Mining and Stockpiling Activities -Visible emissions not to exceed 2096, no off-property <br />'~ ~`' "" ~ transport rf visible emissions. <br />"' ~ Haul Roads - No off-property transport of visible emissions shall apply.to on-site haul roads, <br />~'' ~': ~^"' "' the nuisance guidelines shall apply to off-site haul roads. 7nwR:p-' <br />c. Haul Trucks - No off-property transport of visible emissions except that when operating off the <br />property of the owner or operator, the applicable guidelines shall be no off-vehicle transport <br />of visible emissions. <br />~,f~'.•?~"; .; Control Measures <br />• -.~~rlsSFra1;;`~,~:;.Adequate soil moisture must be maintained in topsoil and overburden to control emissions <br />' `'"~ ' during removal. Watering shall be implemented if necessary. <br />~ya•,. +.f ~~~• <br />;~:rr '2. Topsoil and overburden stockpiles shall be compacted and revegetated within one year. <br />3. ~ Emissions from material handling (i.e. removal, loading, and hauling) shall be controlled by <br />watering at all times unless natural moisture is sufficient to control emissions. <br />4. Vehicle speed on unpaved roads and disturbed areas shall not exceed a maximum of 20 m.p.h. <br />Speed limit signs shall be posted. <br />5. Unpaved haul roads shall be watered as often as needed to control fugitive particulate <br />emissions. <br />6. Reclamation works and sequential extraction of material shall be initiated to keep the total <br />disturbed areas at any one time to a minimum. <br />7. Stockpiling and handling activities shall be suspended when the wind speed exceeds 25 m.p.h. <br />`''~~"029/0011/001 <br />n; <br />d~ <br />