Laserfiche WebLink
PART I <br />Page 11 <br />Permit No. COG-1350000 <br />C J <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />3. Monitoring Requirements <br />In order to obtain an indication of the probable compliance or <br />noncompliance with the effluent limitations specified in :Part I.B.1, <br />the l~ermittee shall monitor all effluent parameters at th~z following <br />frequencies, <br />a) Active Mining Outfall(s) <br />Effluent Parameter Measurement Freauencv J Sam E. Twe J <br />Flow, MGD Weekly Instantaneous <br /> or Continuous <br />pM, s,u. Weekly Grab <br />OiI and Grease, mg/1 Weekly Visual. e/ <br />Total Suspended Solids, mg/1 Monthly Grab <br />Total Iron, mg/1 Monthly Grab <br />Settleable Solids, ml/1 g/ Monthly Grab <br />Total Dissolved Solids, mg/1 J* Quarterly Grab <br />Total Phosphorus (as P), mg/1** Quarterly Grab <br /> <br />b) Post-Paining Outfall(s) <br />Effluent Parameter Measurement Freauencv J Samn1,: Twe <br />Flow, MGD Monthly Insta.taneous <br /> or Continuous <br />Settleable Solids, ml/1 g/ Monthly Grab <br />Oil and Grease, mg/1 Monthly Visual J <br />pM, s.u. Monthly Grab <br />Total Dissolved Solids, mg/1 J* Quarterly ' Grab <br />Total Phosphorus (as P), mg/1** Quarterly Grab <br />* Total Dissolved Solids (TDS) monitoring is required only for discharges to <br />the Colorado River Basin. See specific facility certification rationale <br />to dete~v~ine whether TDS monitoring is required. <br />** Total phosphorus monitoring is required only for discharges to the Dillon <br />Reservor drainage area (i.e., Ten Mile Creek, Snake River, Blue River, <br />and all other tributaries to the Dillon Reservoir) and for discharges to <br />the Uppor Bear Creek drainage area. See specific facility certification <br />rationale to determine whether phosphorus monitoring is required. <br />See Part I.13.4. for footnotes <br />