Laserfiche WebLink
' , <br />V~~J. <br />~O <br />~~ ~` ~~ ~- <br />~~ ~ ~°" U ~~~~~ <br />~~~ <br />E X H I B I T C <br />MINING PLAN ~~~~~~ <br />1a ~`.~ ~ <br />1. Mining will commence as the demand for gravel products <br />arise. This will probably he withing the next calandar <br />year. The mining will end as the gravel runs out. <br />Estimate a ten year supply of gravel products. <br />2. The depth of topsoil is 3 to 12 inches. Topsoil will be <br />placed in a pile and seeded until reclamation begins. <br />See Exhibit E - Map <br />3. The thickness of overburden averages a 4 foot depth. <br />See Exhibit E - Map <br />4. The thickness of gravel will average 14 to 16 foot in <br />depth. <br />5. The haul roads to the lease is already present. One <br />quarter mile of this road will require widening and <br />ditches must be constructed. There will be no shop or <br />other buildings. There will be a gravel yard and a <br />scale house. <br />See Exhibit E - Map <br />6. The pit will be taken down to 16 foot. This will be <br />all on one level and take Easterly as needed. <br />7. The existing road is adequate for a haul road. <br />Ditches will need constructing and there will be some <br />brush removal on the last quarter mile of the road going <br />on the lease. <br />B. There will be no water used for this operation. <br />9. This operation is on expected to directly affect surface ~~.~1 <br />or groundwater. ..//.~ <br />10 . N o t a p p l i c a b l e. ,,,~~.~ 0~~.` `~ ~a~~`~' ~+~'`'J f ~1 r'6'~ \. n~ <br />See Exhibit C9, above. C~ ~ C~ ~'~" <br />11. This operation will be crushing and screening gravel for <br />road material only. There will be no ore and no tailings <br />processed. No chemicals will be used for this operation. <br />