Laserfiche WebLink
October 30, 1997 <br />Dozing <br />3e1 D10N <br />Estimate Track-type Tractor Productivity <br />Page 2 <br />Ident [topsoil ] Hourly O&O [ 170.82) <br />Blade Type [ SU] Dual Tilt [ 100] <br />Dozinq Distance (feet) [ 100] Spoil Pile Factor [ 80] <br />Operator ( 80] Minutes Worked per Hour [ 50] <br />Grade [ O] Bank Material Density [ 3,250] <br />Material Factor [ 120] Loose Material Density ( 2,600) <br />Dozing Factor [ 100] Coefficient of Traction ( 100] <br />Visibility [ 90] Direct Drive Transmission [ 100] <br />Altitude [ 100] Bank cu yds to Move [ 0] <br />Theoretical Production Under Ideal Conditions (Loose cu yd/h) <br />Total Adjustment Factor <br />Adjusted Hourly Production Estimate. (Bank cu yd/h) <br />Adjusted Hourly Production Estimate (Loose cu yd/h) <br />Operating Hours to Complete Job <br />Equipment Expense to Move Required Volume $ <br />Equipment Expense per Bank Cubic Yard $ <br />• <br />• <br />1,547 <br />0.5116 <br />633 <br />792 <br />0 <br />0 <br />0.0000 <br />B-4A <br />