Laserfiche WebLink
October 28, 1997 <br />zing <br />Page 2 <br />Estimate Track-type Tractor Productivity <br />.odel D10N <br />Ident [east pit ] Hourly O&O [ 170.82]I <br />Blade Type [ SU] Dual Tilt [ 100] <br />Dozing Distance (feet) [ 250] Spoil Pile Factor [ 100] <br />Operator [ 80] Minutes Worked per Hour [ 50] <br />Grade [ -15] Bank Material Density [ 3,250] <br />Material Factor [ 96] Loose Material Density [ 2,600] <br />Dozing Factor [ 120] Coefficient of Traction [ 100] <br />Visibility [ 90] Direct Drive Transmission [ 100] <br />Altitude [ 94] Bank cu yds to Move [ 5,582,003] <br />Theoretical Production Under Ideal Conditions (Loose cu yd/h) 736 <br />Total Adjustment Factor 0.7654 <br />Adjusted Hourly Production Estimate (Bank cu yd/h) 451 <br />Adjusted Hourly Production Estimate (Loose cu yd/h) 564 <br />Operating Hours to Complete Job 12,379 <br />Equipment Expense to Move Required Volume $ 2,114,580 <br />Equipment Expense per Bank Cubic Yard $ 0.3788 <br />• <br />• <br />B-3 <br />