Laserfiche WebLink
Revised, October 30, 1997 <br />Productivity and Cost -- trucks -18J FPC-1c2 <br />-----------------Loader-------Haulerl----Haul erg- ---Potential Production--- <br /> <br />• <br />Code C231 ~ Alt. Corr.. 1.00 <br />Segment Speed Cumulative <br />Max at End Minuses <br />20.72 20.72 0.53 <br />30.00 30.00 1.56 <br />30.00 30.00 2.06 <br />30.00 0.00 4.31 <br />RETURN - Travel Time 8 Speeds <br />col ouyo trucks <br />Course ~ Course ~ Material ~Densi ty Lbs perllni [i aL~ ~ HAULER 777C <br />Name ~ Desc ~ Oty BCY ~ LCY ~ BCY ~ Speed ~ ~ ID <br />________ ____________ ____________ _______ _______ __NPH-- ~ Tires 27.OOR49 <br />15J ~15J to east ~ 506,008 2,500 ~ 2,875 ~ 0.00 ~ ~ Type E4 <br />________ ____________ ____________ _______ _______ _______ Speed Corr. 1.00 <br />Empty wt., TONS 68.14 Payload, TONS 98.00 Code C231 Alt. Corr.. 1.001 <br />RETURN Distance Rolling Grade MPH Potential Segment Speed Cumulative <br />Segment FEET Resis[% X Limit Speed Max at End Ninuces <br />1. 5,800 4.00 3.75 30.00 25.40 25.40 25.40 2.77 <br />• ~ 2. 1,295 4.00 5.00 30.00 21.06 25.40 22.10 3.41 <br />3. 2,500 3.00 1.00 30.00 37.84 30.00 30.00 4.38 <br />4. 700 3.00 0.00 30.00 39.22 30.00 0.00 4.70 <br />----------------Hauler Cycle T <br />Load with Exchange........... <br />Haul ......................... <br />Dunp and Maneuver............ <br />Return ....................... <br />Potential Cycle Time.. <br />Wait on Slow Hauler.......... <br />4ait to Load. [Bunching-NOHE7. <br />Total Cycle Time...... <br />O[y S Model 1-992D 1-777C ~ BCY/Hour Avg MPH <br />Loader FiLI Factor ( 14.0 LCY) 100.OY. %~ ~ 992D 1,010 <br />TONS /Pass ( 2,500 Lbs/LCY).. 17.50 ~ ~ 777C 275 15.7 <br />System Passes per Hauler..... 5.60 <br />Hauler - Payload, TONS....... 98.00 ~ -------------------------- <br />- X of Max GVU ....... 102.67. X ----Operating Schedule-•-- <br />Loader Cycle Time, Ninut es ... 0.65 ~ ~ Operator Efficiency 83%~ <br />First Bucket Dump, Minutes... 0.10 ~ I Sched Hrs/Shift 8.0 <br />Hauler Exchange Time, Minutes 0.70 ~ -------------------------- <br />ime_______________ <br />4.05 <br />4.31 <br />1.80 <br />4.70 <br />14.87 <br />0.00 <br />14.87 <br />-----Fleet Estimates------ <br />Fleet Availability 100.0 <br />BCY/Sched Hr 228 ~ X ~i~S <br />Total BCY 506,008 <br />Sched Hrs Reqd 2,216 <br />Total E 702,198 <br />E per BCY 1.388 <br />BCY/Shift 1,827 <br />Shifts Required 276.97 <br />HAUL -Travel Time 8 Speeds <br />col ouyo trucks <br />Course ~ Course ~ Material 0ensity Lbs perlnitial ~ HAULER 7770 <br />Name ~ Desc I Oty BCY ~ LCY BCY ~ Speed ~ ~ ID <br />________ ____________ ____________ _______ _______ __MPH-- ~ Tires 27.OOR49 <br />~15J ~15J to east ~ 506,0081 2,500 ~ 2,875 ~ 0.00 ~ ~ Type E4 <br />________ _____ _______ ____________ _______ _______ _______ I Speed Corr. 1.00 <br />Empty uc., TONS 68.14 Payload, TONS 98.00 <br />HAUL Distance Rolling Grade MPH Potential <br />Segment FEET Resisty. X Limit Speed <br />1. 700 3.00 0.00 30.00 26.67 <br />2. 2,500 3.00 -1.00 30.00 35.96 <br />3. 1,295 4.00 -5.00 30.00 40.02 <br />4. 5,800 4.00 •3.75 30.00 39.72 <br />c ZtoZ L~~ <br />B-23 <br />