Laserfiche WebLink
October 28, 1997 <br />ing <br />...,del D1oN <br />Ident [sec 16 ] Hourly O&O [ 170.82; <br />Blade Type [ SU] Dual Tilt [ 100; <br />Dozing Distance (feet) [ 150] Spoil Pile Factor [ 100; <br />Operator [ 80] Minutes Worked per Hour [ 50' <br />Grade [ -15] Bank Material Density [ 3,250; <br />Material Factor [ 100] Loose Material Density [ 2,600' <br />Dozing Factor [ 120] Coefficient of Traction [ 100] <br />Visibility ( 90] Direct Drive Transmission. [ 100] <br />Altitude [ 94J Hank cu yds to Move [ 567,704] <br />Theoretical Production Under Ideal Conditions (Loose cu yd/h) 1,113 <br />Total Adjustment Factor 0.7973 <br />Adjusted"Hourly Production Estimate (Hank cu yd/h) 710 <br />Adjusted Hourly Production Estimate (Loose cu yd/h) 887 <br />operating Hours to Complete Job 799 <br />Equipment Expense to Move Required Volume $ 136,485 <br />Equipment Expense per Bank Cubic Yard $ 0.2404 <br />~. <br />`J <br />Page <br />Estimate Track-type Tractor Productivity <br />B-I <br />