Exhibit L <br />Reclamation Costs <br />As noted in the Reclamation Plan (Exhibit E), it is observed <br />that the 37 acre tract can be divided into three major land <br />uses: about 5 acres in embankments; 25 acres in mine floor; <br />and about 7 acres. either undisturbed or in the topsoil stor- <br />age area. Thus, only about 30 acres are subject to backfil- <br />ling. rurther, with the deletion of the 17 acre beltway for <br />the street and housing construction, only about 20 acres are <br />planned for immediate (after mining) backfilling with topsoil <br />and reseeding.(note:some backfilling & seeding is already done). <br />As discussed in Exhibit E, under Seedbed Preparation, only <br />about one-half, 8,066 cu/yds of some 15,000 cu/yds of top- <br />soil would be spread for reseeding, with the remainder held <br />in reserve for distribution around housing following const- <br />ruction. However, for the purposes of establishing the <br />reclamation costs, the full amount 'of topsoil and over bur- <br />den handling has been computed. <br />We estimate the 30 acres will be backfilled to an average <br />depth of 24 inches. In most areas the over-burden will <br />average about 20 inches and be covered with another 4 to 8 <br />inches of topsoil. In total, we project the need to handle <br />some 96,800 cu/yds'Pof material. Some backfilling has already <br />occurred on portions of the tract presently permitted for <br />mining. <br />The total need for some 96,800 cu/yds of backfill will be <br />met with an estimated 37,000 cu/yds of over-burden and <br />15,000 cu/yds of topsoil expected to be held in storage. <br />In addition, another 45,000 cu/yds of over-burden and top- <br />soil will be available from the north one-third of the pro- <br />posed storage area ( see discussion at top of page 2 of the <br />Reclamation Plan Exhibit E }. Access to the exposed bank <br />will assure~an ample supply of material and the ability to <br />shape the slope to a grade of 3:1 or flatter. <br />We project reclamation costs as follows: <br />Material handling-- 96,800 cu/yds @ $1.00/ cu/yd = $ 96,800 <br />Grass seed and fertilizer (see Exhibit E pg. 31 = 517 <br />Clean straw (2 tons/ac x 20 ac @ $60/ton) = 2,400 <br />Compaction, seeding, mulching crimping (4x20x$10)= 800 <br />Scarification of topsoil to over-burden (20x$1.8) = 360 <br />Total Reclamation Cost $100,877 <br />Less Reclamation already done - 10.000 <br />Sub-total $ 90,877 <br />We, therefore, request that the Reclamation Bond be set not to <br />exceed $100,000, <br />* 30ac x 43560sgft/ac x 2ft + 27cuft = 96,800 cu/yds <br />