Laserfiche WebLink
<br />-3- <br />the Act, Rules and Regulations, and permit have been complied with pursuant [o C.RS. 34-32.5-121. <br />5) This permit may be revoked or suspended for non-compliance with the Act or <br />applicable Hiles or regulations promulgated by the Board, the permit, or by violation ofa Boazd Order. <br />6) a) Pursuant to 34-32.5-118(5) of the Act, the Board has a right of entry to reclaim the <br />lands affected by the operation, or to respond to an emergency as defined by C.RS. 34-32.5-121(2) <br />b) The Boazd will enter the lands to perform reclaniation only if the Boazd has <br />detemvned: <br />i. that reclamation requved by law to have been performed upon such lands <br />has not been performed, and <br />u. that financial warranty forfeiture proceedings descn'bed in the Act or similar <br />provisions of subsequent laws, if any, have been initiated. <br />c) The Division, acting for the Boazd, will enter lands to respond to an emergency <br />only where the Division determines that any of the conditions of Construction Material Rule 8.4.2. <br />exist. <br />7) The additional conditions set forth in the attached rider, if any, aze incorporated herein <br />by reference. <br />/ XX / a) Rider is attached. <br />// b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. ONG <br />Division Dvector <br />M-M-29 <br />