Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br /> <br />PROJECT IDENTIFICATION <br />lack # X02 :Mate Colorado PetmrUOtli1 C1981-008 <br />Date 04/17/2006 County Monfmso Abbrewahon none <br />User JRS Sde New Honzon Mme Filename 0008•X02 <br />Agency or organaation name Colorado Drorsron OI Mrneo7lS And Ur•uwgy <br />Perron or other job action Notice nllnlent X-2006• I•r2.09 <br />Task descript;on Regrade 38 Mud Pits and Associated Disturbance <br /> <br />HOURLY EQUIPMENT COST <br /> E3as;c ma;;hu,e Cot (_%fiK Savxr; (1 - BSI r Horsepower 310 <br /> Blade type Somr-Umversat <br /> Attachment no. 1 ROPS Cah Shift basis 1 per day <br /> Attachment no 2 3•shmrk upper <br /> Date source fCRGI <br /> Utilization y,~ <br />Cost Breakdown Ownersh;p cosUhour 853 92 NA <br /> OporahngcosVhour $i529 f00 <br /> Rapper op cost/hour g0 00 0 <br /> Operator cosUhour 832 53 NA <br /> Total unit cost/hour $161, 7r Total fleet cost/hour $161,74 <br /> <br />MATERIAL QUANTITIES <br />~nihat Swell Loose <br />votuma 600 BCY factor 1250 volume 750 LCY <br />Source of estim ated volume Orwsion Estim ate <br />Source of estimated swell !actor CAI Handha>k <br /> <br /> <br />HOURLY PRODUCTION Job Condition Correction FaclQSr Source <br /> Operator skill 0 76 (avg.l <br />Average push distance - 50 feet Matenal consstency 1 10 (Car HBl <br />Unadjusted hourly production (,4000 LCY/hr Dozing method 1 00 )yen ) <br /> Vsib;hly 100 (avy.) <br />Matenal consistency descnpUon Job efficiency 0 83 (ishitt/day) <br />Partly ronsobdafad slorkpifa Spoil pile 0.80 (/nil-d) <br /> Push gradient 1 00 (Cal HB) <br />Average push gradient 0.00 °ir Ipos) Altitude 100 (Cat H81 <br />Avorage site altitude 5.700 feet Matenal weight 0 87 /Cat HB) <br /> Blade type 1.00 1S/SU/U) <br />Material weight 2 650 Ibs/LCY Net correction 0 48 <br />Weight desuiption <br />Docomposad rock - ?5% Roak. 7596 Earth Adjusted unit production 665.39 LGYlhi <br /> Adjusted flee) production 665.39 LCYihr <br />JOB TIME AND COST <br />Fleet s¢e 1 Dozer(sj Total )ob time 1.13 Nours <br />Unit cost E0.243 ILCY Totat job cost $182 <br /> <br />