Laserfiche WebLink
<br />EXHIBIT 8 <br />INDEX CONTINUED <br />I 1 <br />LJ <br /> <br />TAB 4.10 EAST ROCKFALL HAZARD TRENCH <br /> OUTSLOPE, ]0-YR 24-HR SAE <br />TAB 4.11 WATER TANK ROCKFALL HAZARD <br /> TRENCH, 10-YR 24-HR SAE <br />TAB 4.12 WATER TANK ROCKFALL HAZARD <br /> OUTLSOPE, 10-YR 24-HR SAE <br />TAB 4.13 WEST ROCKFALL HAZARD TRENCH, X-SECT <br /> A-G, 10-YR 24-HR SAE <br />TAB 4.14 WEST ROCKFALL HAZARD TRENCH, X-SECT <br /> G-L, 10-YR 24-HR SAE <br />TAB 4.15 WEST ROCKFALL HAZARD TRENCH <br /> OUTSLOPE, X-SECT A-G, ]0-YR 24-HR SAE <br />TAB 4.16 WEST ROCKFALL HAZARD TRENCH <br /> OUTSLOPE, X-SECT G-J, 10-YR 24-HR SAE <br />TAB 4.17 WEST ROCKFALL HAZARD TRENCH <br /> OUTSLOPE, X-SECT J-L, 10-YR 24-HR SAE <br />TAB 4.18 #7 NORTH ESCAPE SHAFT N OUTSLOPE, 10- <br /> YR 24-HR SAE <br />TAB 4.19 #7 NORTH ESCAPE SHAFT UPPER SIDE OF <br /> TOPSOIL STOCKPII.E, 10-YR 24-HR SAE <br />TAB 4.20 #7 NORTH ESCAPE SHAFT W OUTSLOPE, 10- <br /> YR 24-HR SAE <br />TAB 4.21 #7 NORTH ESCAPE SHAFT MAIN PAD & E <br /> OUTSLOPE, 10-YR 24-HR SAE <br />TAB 5.1 & 5.2 & 5.3 POND E WATERSHED AND SEDIMENT <br /> TRANSPORT MODELLING <br />TAB 6 POND E SPILLWAYDESIGN <br />TAB 6.1 POND E EMERGENCY SPILLWAY <br /> HYDROLOGY AND SEDIMENTOLOGY EVAL. <br />TAB 6.2 POND E PRINCIPAL SPILLWAY HYDROLOGY <br /> AND SEDIMENTOLOGY EVAL <br />TAB 7.1 ROCKDUST TANK PEAK FLOW <br /> CALCULATION <br />TAB 7.2 SOUTH TS PILE PEAK FLOW CALCULATION <br />TAB 7.3 VENT PAD PEAK FLOW CALCULATION <br />TAB 7.4 PUMP AREA PEAK FLOW CALCULATION <br />TAB 7.5 NORTH TS PILE PEAK FLOW CALCULATION <br />TAB 7.6 SANSTONES SUBSTATION PEAK FLOW <br /> CALCULATION <br />Permit Renewal No. 3 <br />Page 2 of 2 1115/00 <br />