Laserfiche WebLink
s5S c~.~l <br />~~5~~ <br />/mil- moo ~ - 03 9 <br />STATE OF COLOlZADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 J <br />Denver, Colorado 8ozo3 Response to Reclamation Permit Application Consideration <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />www.watecstate.co.us <br />DATE: June 16, 2004 <br />of cord <br />`~ <br />« .r <br />~/896s <br />R~CE~~~' Bill Owens <br />vernor <br />/// ussell George <br />ry Ezecu[ive Director <br />L O ~ 2OU6 Hal D. Simpson, P.E. <br />State Engineer <br />TO: Steve S. Shuey, Senior Environmental Protection Specialist "DiYisjon of Minerals end GeoloEy <br />CC: Division 5 Office; District 70 Water Commissioner <br />FROM: Craig M. Lis, P.E. ~~~ <br />RE: Operator: Chevron Shale Oil Company, North Clear Creek Construction Materials <br />Mine, File No. M-06-039 <br />Section 4, Twp 5 S, Rng 98 W, 6th P.M., Garfield County <br />Landowner- Chevron Shale Oil Company <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclamation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well pemtit, as applicable. Prior to obtaining a permit, an approved water supply plan or decreed plan far <br />augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document the <br />locations of all wells within 600 fee[ mile of the permit azea. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the pemlit azea or contact this office regarding the <br />600 foot spacing notification/heazing process. <br />^ The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />® The applicant has indicated plans to use other water for: dust control uses at the permit site. The applicant will <br />need to provide evidence to this office that the water is pemutted or decreed for such uses. <br />® Other: Storm wafer must be released to the stream within 72-hours of impoundment. <br />COMMENTS: <br />