Laserfiche WebLink
CC&V Mine <br />Phase IV b/c Diversion Options <br />PROJECT NO.: 003-2203 <br />CALCULATION TABLE 1. AREA 8 SCS CURVE NUMBER (CN). <br />SUBWATERSHED: Phase IV b/c Diversion Ditch: Subbasins 1 - 3 with a onion of Subbasin 0, <br /> Wood Grass Stripped <br /> CN: CN = 66 CN = 71 CN = 80 <br /> AREA AREA AREA AREA Weighted Curve Summary of Est. <br />SUBBASIN ID (ft^2) AREA (miZ) (ft^2) (ft^2) (ft^2) Number Peak Flows (cfs) <br />0 718,763 0.026 0 ~ 718,763 0 71 10 <br />1 1,724,612 0.071 776,530 0 948,082 74 36 <br />2 1,400,903 0.041 0 181,422 1,219,481 79 54 <br />3 470,781 0.016 0 100,480 370,301 78 61 <br />vzerzooz iosaAnn Golder Associates 003-2203.20D <br />J:\OOJOBS\003-220315URFWATE1Comp CNS.xIS Sheetl <br />