Laserfiche WebLink
<br />TABLE OF CONTENTS <br />PAGE N0. <br />4.08 USE OF EXPLOSIVES .................................4.08-1 <br />4.09 DISPOSAL OF EXCESS SPOIL AND UNDERGROUND <br />DEVELOPMENT WASTE .................................4.09-1 <br />4.10 COAL PROCESSING WASTE BANKS ....................... 4.10-1 <br />4.10.1 General Requirements ......................... 4.10-1 <br />4.10.2 Site Inspection .............................. 4.10-3 <br />4.10.3 Water Control Measures ....................... 4.10-3 <br />4.10.4 Construction Requirements .................... 4.10-5 <br />4.11 COAL PROCESSING WASTE ............................. 4.11-1 <br />4.11.1 Burning ................... <br />. 4.11-1 <br />• <br />4.11.2 .................. <br />Burned Waste Utilization.. . 4.11-1 <br />4.11.3 Return to Underground Workings ............... 4.11-2 <br />4.11.4 Disposal of Non-Coal Waste ................... 4.11-2 <br />4.11.5 Dams and Embankments ......................... 4.11-3 <br />4.12 SLIDES AND OTHER DAMAGE ...........................4.12-1 <br />4.13 CONTEMPORANEOUS RECLAMATION .......................4.13-1 <br />4,14 BACKFILLING AND GRADING ...........................4.14-1 <br />4.14.1 General Requirements .........................4.14-1 <br />4.14.2 General Grading Requirements .................4.14-1 <br />4.14.3 Covering Coal and Acid and Toxic-Forming <br />Materials ...............................4.14-1 <br />4.14.4 Thin Overburden ..............................4.14-2 <br />4.14.5 Thick Overburden .............................4.14-2 <br />4.14.6 Regrading or Stabilizing Rills and Gullies...4.14-3 <br />• <br />vi <br />