Laserfiche WebLink
• <br />TABLE OF CONTENTS <br />PAGE N0. <br /> <br />1 <br />2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND <br />MINING ACTIVITIES - MINIMUM REQUIREMENTS FOR <br />OPERATION AND RECLAMATION PLANS ...................2.05-1 <br />2.05.1 Objectives ...................................2.05-1 <br />2.05.2 Operation Plan - Estimated Area for Life of <br />Operation ...............................2.05-1 <br />2.05.3 Operation Plan - Permit Area .................2.05.3-1 <br />2.05.4 Reclamation Plan .............................2.05.4-I <br />2.05.5 Post-Mining Land Use .........................2.05.5-1 <br />2.05.6 Mitigation of Surface Coal Mining Operation <br />Impacts .................................2.05.6-1 <br />2.06 REQUIREMENTS FOR PERMITS FOR SPECIAL CATEGORIES <br /> OF MINING ......................................... 2.06-1 <br />2.06.1 Scope ........................................ 2.06-1 <br />2.06.2 Experimental Practices Mining ................ 2.06-2 <br />2.06.3 Mountaintop Removal Mining ................... 2.06-2 <br />2.06.4 Steep Slope Mining ........................... 2.06-2 <br />2.06.5 Permits Incorporating Variances From <br /> Approximate Original Contour Restoration <br /> Requirements for Steep Slope Mining..... 2.06-3 <br />2.06.6 Prime Farmlands .............................. 2.06-3 <br />2.06.7 Variances for Delay in Contemporaneous <br /> Reclamation Requirements in Combined <br /> Surface and Underground Mining <br /> Operations .............................. 2.06-4 <br />2.06.8 Surface Coal Mining and Reclamation <br /> Operations on Areas, or Adjacent to <br /> Areas, Including Alluvial Valley <br /> Floors .................................. 2.06-4 <br />2.06.9 Angering ..................................... 2.06-6 <br />2.06.10 Coal Processing Plants and Support Facilities <br /> Not Located Within the Permit Area...... 2.06-6 <br />2.06.11 In-Situ Processing Activities ................ 2.06-6 <br />2.06.12 Surface Coal Mining and Reclamation Operation <br /> Requirements Involving the Removal of <br /> Coal Refuse Piles ....................... 2.06-6 <br />iii <br /> <br />