Laserfiche WebLink
i ~ ~.~n u <br />~~ <br />~ ~~L, <br />,. <br />` ~ `~ ~ a <br />• III IIIIIIIIIIIIIIII <br />sss <br />COLORACO DEPARTMENT OF HEALTH <br />r <br />' 4210 EAST 11TH AVENUE DENVER, COLORADO 80220 PHONE 320- 8333 <br />February 28, 1979 <br />CERTIFIED MdIL N0: 264110 <br />Rockcastle Company <br />Post Office Box 1038 <br />Janesville, WI 53545 <br />Re: Final Permit, NPDES Permi'f~Numbe~: 'C0=0035653, RoutI County.' <br />Gentlemen: <br />Enclosed please find a copy of the permit issued under the Federal Ciean <br />Water Ac[ and Colorado Water Quality Control Act. <br />Issuance of this permit constitutes a final determination by the Division <br />of Administration of the Colorado Department of Health, in conjunction with <br />the 11.5. Environmental Protection Agency and may be subject to administrative <br />review proceedings pursuant to the Slate Administrative Procedure Ac [, in- <br />cluding an adjudicatory hearing. You are advised to consult this act any; <br />particularly to consult Sections 24-4-104, 24-4-105, 24-4-102(7), and 25-8-401, <br />C.R.S. 1973 for more information. In addition, the Regulations for the State <br />Discharge Permit System contains material that is pertinent to any admini- <br />strative review of the issuance of this permit. ' <br />Your NPDES Waste Discharge Permit requires that specific action be performed <br />a[ designated times. Failure to meet these requirements constitutes a vio- <br />lation of this permit and can result in civil and/or criminal action(s). <br />Please read .he permit very thoroughly. <br />1. Alt municipal and industrial facilities are required to submit self- <br />, monitoring information. (PART I. B. Monitoring and Reporting). <br />Frequencies and types of self-monitoring are summarized in PART I. A. <br />Effluent limitations and Monitoring Requirements. <br />2. Monitoring and reporting requirements for feedlots are described in <br />PART I. A. Effluent limitations and Monitoring Requirements (see 2. c.) <br />and in PART I. B. Monitoring and Reporting. <br />3. In same instances a schedule of compliance is to be submitted if required <br />by your permit. Please note [he required date as specified in PART I of <br />the permit. <br />