Laserfiche WebLink
<br />TERROR CREEK COMPANY <br />CERTIFICATION OF CONSTRUCTION <br />DUGOUT POND <br />The dugout pond was originally constructed during 1983 or 1984 to <br />contain the run-off from topsoil stockpile no. 1. The location of <br />the dugout pond and topsoil stockpile no. 1 is shown on Map 14, <br />Sedimentation Control and Small Area Exemption Map. Page 11 of <br />Exhibit 9 presents a plan view, section and volume calculation for <br />the dugout pond. <br />The dugout pond was constructed by excavating below ground level. <br />No compaction data is available. The pond does not have designed <br />embankments. <br />Information considered for this certification include history of <br />the pond (stable for about 9 years), and personal observations of <br />the pond. To the best of my knowledge and belief, the dugout pond <br />was constructed using sound engineering practices and the plan, <br />section and volume calculation presented on Page 11 of Exhibit 9 <br />illustrate the actual configuration of the dugout pond on the date <br />of this certification. <br />/~~q• <br />/~ ~~~p0 REG~•. <br />ames Stover ~ ~~. ~~ a'a ~ Date <br />istered Professi '~ ne <br />State of Colorad5~`mo. ~~0 ~ *~ <br />.9:~ ~~ <br />\WP51\TCC\CERT-DUG <br />