Laserfiche WebLink
• Shop/Warehouse: <br />The shop/warehouse is of steel construction and is a two story building. Construction began approxi- <br />mately June, 1975, and was completed approximately November, 1975. An addition of two bucket bays, <br />and a new welding shop were completed in January, 1989. <br />The shop consists of about 24,350 square feet which includes work bays, bucket bays, a machine shop, <br />and a welding area. The warehouse consists of about 10,400 square feet on the first floor and 8,600 <br />square feet on the second floor. This area includes parts storage and maintenance and warehouse <br />offices. Drainage from [his building flows into the Industrial Waste Pond. <br />This structure is not scheduled to be removed until the coal reserves are exhausted. <br />Fuel and Lube Buildino: <br />The fuel and tube building is a one story building of steel construction. Construction began approxi- <br />mately July, 1979, and was completed approximately November, 1979. <br />This building consists of about 3,200 square fee[ of fuel and tube areas and 4,400 square feet of equip- <br />. ment wash area. Drainage from the fuel and tube building flows into the industrial waste control tacilities, <br />which are discussed in detail in Section 4.3. <br />The fuel and tube building is not scheduled to be removed until the coal reserves are exhausted. <br />3-181 i ~ ;tEVISION APIp'F?OVF=D <br />' ~ (SAT[ x-/9'93 <br />;~ <br />