Laserfiche WebLink
Table 21 <br />Culvert Sizing <br /> <br /> 10YR - 24HR Minimum"~ Culvert <br />Culvert Number Peak Discharge (CFS) Diameter (inches) Comments <br />43" 7.3 18 MR-401/92 <br />44" 7.3 18 MR-401192 <br />45 2.62 15 TR-28 9/93 <br />46 2.26 12 TR-3112/3/93 <br />47 2.61 15 Revised 5/95 <br />48 49.84 42 TR-3112/3/93 <br />49 54.05 42 TR-2710/15/93 <br />50 4.05 18 TR-2710/15/93 <br />51 55 42 TR-2710/15/93 <br />52 48.59 36 TR-2710/15/93 <br />53 6.4 21 TR-2710/15/93 <br />54 75.51 48 TR-2710/15/93 <br />55 1.01 8 5/95 <br />56 4.39 18 <br />57 51.22" 1@48' or2@33" 5/95 <br />58 1.45 12 5/95 <br />59 1.45 9 5/95 <br />60 13.38~'~ 24 5195 . <br />61 0.95 8 5/95 <br />62 0.68 12 9/95 <br />63 1.28 12 9/95 <br />64 8.75 24 <br />65 0.1 12 <br />RDA-A 2.32 12 TR-28 9/93 <br />RDA-B 4.02 15 TR-28 9/93 <br />Relief Drains <br />S. of D34B 0.5 24" Half Culvert TR-27 10/15/93 <br />"' - From "Handbook of Steel Drainage and Highway Construction Products" <br />nomograph with no head on pipe and using HW/D Scale No. (3). <br />X21 Sized using 3 ft. of head on pipe (HW/D = 1.5), HW/D Scale No. (1). <br />~'~ Sized using 2.4 ft. of head on pipe (HW/D = 1.8), HW/D Scale No. (3). <br />~"' Culverts 23 and 24 are inlet culverts to Culvert 25 Culvert 25 was sized using the <br />Hazen Williams formula Exhibit 19, West Portal Data C21 through C25 <br />j5~ Sized using 1.5 ft. of head on pipe (HW/D = 1.5), HW/D Scale No. (1). <br />iei As-Built 3/27/88 SDM <br />~'~ 100-year 24-hour peak discharge <br />Temporary culverts installed as needed • <br />NE MR-84 2.05-14A Revised 6/01 <br />