Laserfiche WebLink
<br />EXHIBIT D <br />~J <br />The mining would commence sometime in 1995. <br />The initial step in mining would be stripping back the (1) <br />foot cover of soil and stockpiling the material away from the <br />active pit area. <br />The mining would, in in the northeast corner of the <br />property. From that °~the gravel deposit would be mined in <br />five-acre rectangular panels, ending at some future date at the <br />northwest corner of the forty S40) acre parcel. <br />The open-pit mine would be a dry pit operation, producing only <br />°pit run" sand and gravel aggregate. <br />The product would be loaded by a front-end loader directly <br />into trucks and thence hauled along existing or newly constructed <br />roads. <br />site. <br />No office building or processing plant would be located at the <br />As an acre of ground within the proposed mining site contains <br />approximately 90,000 ± tons of aggregate, it is assumed that the <br />maximum amount mined per year would be about 450,000 short tons <br />based on 5 acre mining panels. <br />