Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATIO <br />Agency or organization name : COMG <br />Task # : 008 State : Colorado <br />Date : 08/082005 County : La Plata <br />User : TAK Site :Carbon Junction <br />Permit or other job adion :TR-13 <br />Task description :Haul <br />HOURLY E4UIPMENT COST <br />PermiUob #:C-92-080 <br />Abbreviation :none <br />Filename : C080.006 <br />f/ topsoil pile #2 to North Pit <br />Model :Cat 637G Shift basis : 1 per day <br />Cost Breakdown : Job utilization % Horsepower : 740 <br />Ownership cosUhour : $72.99 NA Weight (UST) : 5738 <br />Operating cosVhour : $162.60 100 Cost data source : (CRG) <br />Source of quantity takeoff :Cost estimate in TR-12 <br />Source of estimated swell fador : DMG estimate <br />HOURLY PRODUCTION <br />Hauling Capacity <br />Scraper Pavload (weiahtl Basis : ~ Scraper Bowl (volume) Basis <br />Material weight: 1,600 poundslLCY Struck volume: 2L00 LCr <br />Material description : Heaped volume : 31.00 LCY <br />Too Soil Average volume : 26.00 LCV <br />Rated payload : 75,000 pounds <br />Payload capacity : 46.88 LCY Adjusted rapacity <br />Cvcle Time (load + haul + spread + retuml ~ Loading time <br />Maneuver and spreading time <br />Travel time : ' loetlinp time per pair on puahqull models <br />28.00 LCY "' <br />1.80 minutes <br />0.60 minutes <br />Route 1 Distance (feet) Grade (%) Roll. res.(%) Total res.(%) Velocity (fpm) I Travel time (min.) <br />Haul : 2 200 2.7 5.0 7.7 1,131 1.99 minutes <br />Retum: 2200 ~ -2.7 ~ 5.0 ~ 2.3 ~ 2,960 ~ 0.74 minutes" <br />" Vavel lime adjuetetl for eCCebrelion erM deceleration al load erM tlump poirrta <br />velocities ere max. adeinaMe Ixr lolal resistance ehoxm, rpt evereae <br />Job Condition Correction Faders <br />Site attttude (feet) : 7,000 <br />Altitude adjustment fador : 1.00 (Cat HB) <br />Job efficiency fador : 0.83 (1 shiWday) <br />Net job corredion fador <br />Total cycle time : 5.14 minutes <br />Adiusted Houdv Produdion_; <br />Unadjusted untt produdion <br />Adjusted unit produdion <br />Adjusted fleet produdion <br />2limes wlunro on puehyull models <br />303.79 LCY/Hour"' <br />252.15 LCYlHour <br />252.15 LCY/Hour <br />JOB TIME AND COST <br />Fleet size : 1 Scraper(s) Total job time : 215.29 Hours <br />Unit cost : $1.062 /LCY Total job rest : $57,843 <br />