Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 01/05/2006 <br />User : TAK <br />Agency or organization name : CDMG <br />Permit or other job action : TR-13 <br />Task description : CUt S <br />HOURLY EQUIPMENT COST <br />at base of North <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.66 NA <br /> Operating cosUhour : $93.55 100 <br /> Ripper op. cosUhour : $1.13 f0 <br /> Operator cosUhour: $31.78 NA <br /> Total unit cost hour : $178.12 Total fleet cosUhour : $178.12 <br /> <br />MATERIAL QUANTITIES ~~~ ~~ ~~ <br />Initial Swell Loose <br />volume : 11,220 BCY factor : 1.667 volume : 18,700 LCY <br />Source of estimatetl volume :Reclamation plan, page 5-25 <br />Source of estimated swell factor : DMG estimate <br />,: <br /> <br />HOURLY PRODUCTION <br /> <br />Job Condition Correction Factors <br />;; , <br />Source <br />Average push distance : 120 feet <br />Unadjusted hourly production : 1,093.1 LCY/hr <br />Material consistency description <br />Rock, poorly ripped or blasted <br />Average push gradient : 1.00 % (/ <br />Average site altitude : 7,000 feet <br />Material weight : 2, 550 Ibs/LCY <br />Weight description <br />Sandstone <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.611 /LCY <br />then push to pit <br />Operator skill : 0.75 <br />Material consistency : 0.60 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.99 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.27 <br />Adjusted unit production : 291.34 LCY/hr <br />Adjusted fleet production : 291.34 LCY/hr <br />Total job time : 64.19 Hours <br />Total job cost : $11,433 <br />