My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE69052
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE69052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:14:34 PM
Creation date
11/20/2007 10:40:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
9/7/2006
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 01/05/2006 <br />User : TAK <br />Agency or organization name : CDMG <br />Permit or other job action : TR-13 <br />Task description : CUt S <br />HOURLY EQUIPMENT COST <br />at base of North <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.66 NA <br /> Operating cosUhour : $93.55 100 <br /> Ripper op. cosUhour : $1.13 f0 <br /> Operator cosUhour: $31.78 NA <br /> Total unit cost hour : $178.12 Total fleet cosUhour : $178.12 <br /> <br />MATERIAL QUANTITIES ~~~ ~~ ~~ <br />Initial Swell Loose <br />volume : 11,220 BCY factor : 1.667 volume : 18,700 LCY <br />Source of estimatetl volume :Reclamation plan, page 5-25 <br />Source of estimated swell factor : DMG estimate <br />,: <br /> <br />HOURLY PRODUCTION <br /> <br />Job Condition Correction Factors <br />;; , <br />Source <br />Average push distance : 120 feet <br />Unadjusted hourly production : 1,093.1 LCY/hr <br />Material consistency description <br />Rock, poorly ripped or blasted <br />Average push gradient : 1.00 % (/ <br />Average site altitude : 7,000 feet <br />Material weight : 2, 550 Ibs/LCY <br />Weight description <br />Sandstone <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.611 /LCY <br />then push to pit <br />Operator skill : 0.75 <br />Material consistency : 0.60 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.99 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.27 <br />Adjusted unit production : 291.34 LCY/hr <br />Adjusted fleet production : 291.34 LCY/hr <br />Total job time : 64.19 Hours <br />Total job cost : $11,433 <br />
The URL can be used to link to this page
Your browser does not support the video tag.