My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE69052
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE69052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:14:34 PM
Creation date
11/20/2007 10:40:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
9/7/2006
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Carbon Junction Mine oero: vsrzo06 <br />Proparea by: TK <br />Task 024 <br />Puchase filter rock and rock riprap for Carbon Junction channel <br />Fi/ter rock: <br /> Purchase price per ton for 314" D50 in <br />$7.00 Durango area, before hauling and volume <br /> discount (from <br /> http://candjgravel.com/productpage. htm) <br />X 1.5 Tons per cyd (conversion factor) <br />$10.50 Subtotal <br />+ $7.46 Delivery cost per cyd (8.7 cyds per 10-ton <br /> truck, assume $50 per truck-loadl <br />$17.96 Subtotal <br />- $4.49 25% volume discount (assumed) <br />$13.47 Subtotal <br />X 584 No. of cyds needed for Carbon Junction <br />Channel (page 5-10 of reclamation plan <br />$7,866 Total cost for fitter rock <br />Rock riprap: <br />Purchase price per ton for large riprap in <br />$11.00 Durango area, before hauling and volume <br />discount (from <br />http://candjgravel.com/productpage. htm) <br />X 1.5 Tons per cyd (conversion factor) <br />$16.50 Subtotal <br />+ $6.25 Delivery cost per cyd (6.7 cyds per 10-ton <br />truck, assume $50 per truck-load) <br />$22.75 Subtotal <br />- $5.69 25% volume discount (assumed) <br />$17.06 Subtotal <br />X 4,221 No. of cyds needed for Carbon Junction <br />Channel (page 5-10 of reclamation plan) <br />$72,016 Total cost for rock riprap <br />$79,882 GRAND TOTAL COST (ROCK FILTER + ROCK RIPRAP) <br />
The URL can be used to link to this page
Your browser does not support the video tag.