Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 02Y <br />Date : 12Po1/2005 <br />User : TAK <br />State :Colorado <br />County : La Plata <br />Site :Carbon Junction Mine <br />PermiUob#:C-92-080 <br />Abbreviation :none <br />Filename : C080-022 <br />Agency or organization name : CDMG <br />Permit or other job action : TR-13 <br />Task description :Regrade C.J. Cany. channel f/1962'to 922'shown on TR-12 profile <br />HOURLY EQUIPMENT COST - <br /> Basic machine :Cat D9R - 9SU Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $51.66 NA <br /> Operating cosUhour : $93.55 100 <br /> Ripper op. cosUhour : $1.13 1p <br /> Operator cost/hour : $31.78 NA <br /> Total unit cosUhour : $178.12 Total fleet cosUhour : $178,12 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,079 BCY factor : 1.430 volume : 1,543 LCY <br />Source of estimated volume :Lewicki profile of ditch approved TR-12 (f040'Lr14'Wx2'D)27cf/c <br />d <br />Source of estimated swell factor :DMG estimate y <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Rock, poodv ripped or blasted <br />Average push gradient : 0.07 % (I <br />Average site altitude : 7,000 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.355 /LCY <br />Operator skill : 0.75 <br />Material consistency : 0.60 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.24 <br />Adjusted unit production : 501.10 LCY/hr <br />Adjusted fleet production : <br />.................... 501.10 LCY/hr <br />Total job time : 3.08 Hours <br />Total job cost : $548 <br />