Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 020 <br />Date : 01/03/2006 <br />User : TAK <br />County : La Plata <br />Sile :Carbon Junction <br />Agency or organization name : CDMG <br />Permit or other job action : TR-13 <br />Task description :Finish-grade South pit drill <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H <br />Attachment no. 1 :NA <br />Attachment no. 2 : NA <br />Horsepower: 215 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown Ownership cost/hour : $34.94 NA <br />Grader operating cosUhour : $42.36 100 <br />Ripper operating cosUhour : $0.00 NA <br />Operator cosUhour : $31.97 NA <br />Total unit cost/hour : $109.27 Total fleet cosUhour : $109.27 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 3.50 acres <br />Source of estimated acreage : TR-12 cost estimate <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees ` ' at o degrees, blade is perpendiwlar <br />Effective blade length : 12.10 feet ro direction or travel. <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet " "widthW ripper beam on upping applications <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />Job Condition Correction Factors Source <br />Average site altitude : 7,000 feet Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency adjustment factor : 0.85 (1sh/d, mod.) <br />Net job correction : 0.8500 multiplier <br />Adjusted houdy unit production : 1.3008 acres/hour <br />Adjusted houdy fleet production : 1.3008 acres/hour <br />_.... <br />J06 TIME AND COST <br />Fleet size : 1 grader(s) Total job time : 2.69 hours <br />State :Colorado <br />Pennitfjob # : C-92-080 <br />Abbreviation :none <br />Filename : C080-020 <br />Unit cost : $84.01 per acre Total job cost : $294 <br />