My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE69052
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE69052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:14:34 PM
Creation date
11/20/2007 10:40:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
9/7/2006
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : CDMG <br />Permit or other job action : TR-13 <br />Task description :Rough grade South Pit drill pad <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank ripper <br /> Utilization <br />OwnershipwsVhour : $51.66 NA <br />Operating cosVhour : $93.55 100 <br />Ripper op. cosUhour : $1.13 10 <br />Operator cosNhour : $31.78 NA <br />Total unit cosUhour : $178.12 Total fleet cosUhour <br />volume : 11,293 LCY <br />78.12 <br />Swell Loose <br />factor : NA volume : 11,293 LCY <br />Source of estimated volume : 3.5 acres (f/ TR-12 estimate) X 2 R deep <br />Source of estimated swell factor :DMG estimate <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted howdy production : 2,110.5 LCYfhr <br />Material consistency description <br />Loose stockpile <br />Average push gradient : 0.00 % (F <br />Average site altitude : 7,000 feet <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.178 /LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net cortection <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />0.75 (avg.) <br />1.20 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (lshiff/day) <br />0.80 (/nd-rf) <br />1.00 (Cat HB) <br />1.00 (Caf HB) <br />0.79 (Cat HB) <br />1.00 (S/SU/U) <br />0.47 <br />999.92 <br />999.92 <br />11.29 <br />$2,012 <br />LCY/hr <br />Lcvmr <br />Hours <br />Horsepower: 405 <br />Shin basis : 1 pertlay <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.