Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 016 <br />Date : 01/052006 <br />User : TAK <br />State :Colorado <br />County : La Plata <br />Site :Carbon Junction <br />Agency or organization name : COMG <br />Permit or other job aMion : TR-13 <br />Task description : Regr <br />HOURLY EQUIPMENT COST <br />#2 <br />Basic machine :CAT 14H <br />Permitlob # : C-92-080 <br />Abbreviation :none <br />Filename : C080-016 <br />Horsepower: 215 <br />Attachmentno.l:NA <br />Attachment no. 2 :NA <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown Ownership cost/hour : $34.94 NA <br />Grader operating cost/hour : $42.36 100 <br />Ripper operating cosUhour : $0.00 NA <br />Operator cost/hour : $31.97 NA <br />Total unit cost/hour : $109.27 Total fleet cosUhour : $109.27 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 2.69 acres <br />Source of estimated acreage :Page 5-1 of reclamation plan <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees' ' at 0 degrees, 61atle is perpendicular <br />Effective blade length : 12.10 feet to direction of travel. <br />Width of blade ovedap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet " "width of upper Deam on ripping applicat ions <br />Unadjusted hourly unit protludion : 1.5303 acres/hour <br />Job Condition Correclion Factors Source <br />Average site altitude : 7,000 feet Altitude adjustment factor : 1.00 (Cat HB) <br /> Job efficiency adjustment factor : 0.85 (fsh/d, mod.) <br /> Net job correction : 0.8500 multiplier <br />