Laserfiche WebLink
impoundment criteria of Rule 4.05.9(3), the State Engineer's Office or C.R.S. 37-87- <br />105. <br />The attached inspection sheet covers other items related to the ongoing performance of <br />the pond at the time of the inspection. <br />I certify that the sediment pond at the Rimrock Mine has been constructed according to <br />the plans and is functioning well and that prudent state-of-the-art engineering has been <br />employed and the dam is sound, with no current environmental threats or construction <br />& maintenance problems. <br />p'0 HECO <br />~*f C. (F~/9~0 <br />n, <br />0 <br />~,~~~~ ~: ~j1~~~~3 <br />0W l <br />_.'~~~~ <br />