Laserfiche WebLink
<br /> <br />z <br />6. Annual or noxious weeds will be controlled on all disturbed areas as <br />directed by the White River Resource Area i•tanager. 1.lethod of control <br />shzill be by an approved mechanical method or an Environmental Protection <br />Agency (EPA) registered herbicide. All herbicide application proposals <br />must be approved by the BLM. Application of herbicides must be under <br />direct field supervision of an EPA certified pesticide applicator. <br />7. WhE~n construction of the pipeline (right-of-way C-40665) for Fuel <br />Re:;ources Development Corporation begins, mining operations must be <br />conducted so as not to interfere with construction or operations of <br />pileline. <br />8. Benches will be built 15' wide by 20' high to maintain slope stability <br />an~i provide safety benches for falling rocks. <br />9. Additional stipulations maybe required by the Authorized Officer after <br />mining begins to insure safety and ensure reclamation of the area. <br />16Z:F 13ECKETT:br:04/16/87:18720 <br />